File #: AI 13-2427    Version: 1 Name: VISPO Agreements Aug 2020
Type: Action Item Status: Passed
File created: 7/28/2020 In control: Board of Directors
On agenda: 8/11/2020 Final action: 8/11/2020
Title: Consider recommendation from EAA staff to approve Voluntary Irrigation Suspension Program Option forbearance agreements with A & S Ranch, Ltd.; Troy L. Bippert and Michelle Bippert, Shawn P. Noonan and Kris A. Noonan; Ray Griggs and Sharon M. Griggs; William E. Schultz, Jr. and Pamela M. Schultz; and Archbishop of San Antonio - St. Joan of Arc Catholic Church for Edwards groundwater withdrawal rights in the total amount of not less than $212,714.37 and not to exceed $842,979.17 for the Voluntary Irrigation Suspension Program Option in support of the Edwards Aquifer Habitat Conservation Plan.
Attachments: 1. VISPO_Template, 2. VISPO RO August 2020 Board

Title

Consider recommendation from EAA staff to approve Voluntary Irrigation Suspension Program Option forbearance agreements with A & S Ranch, Ltd.; Troy L. Bippert and Michelle Bippert, Shawn P. Noonan and Kris A. Noonan; Ray Griggs and Sharon M. Griggs; William E. Schultz, Jr. and Pamela M. Schultz; and Archbishop of San Antonio - St. Joan of Arc Catholic Church for Edwards groundwater withdrawal rights in the total amount of not less than $212,714.37 and not to exceed $842,979.17 for the Voluntary Irrigation Suspension Program Option in support of the Edwards Aquifer Habitat Conservation Plan.

 

Body

STAFF RECOMMENDED MOTION:

 

Move the board adopt Resolution and Order No. 08-20-970 of the Edwards Aquifer Authority Board of Directors to approve VISPO forbearance agreements for permitted Edwards groundwater rights between the EAA and the permit holders listed below, in the total amount of not less than $212,714.37 and not to exceed $842,979.17 for the Voluntary Irrigation Suspension Program Option in support of the Edwards Aquifer Habitat Conservation Plan and authorizing the General Manager to execute the Agreements.

 

 

SUMMARY:

 

The purpose of this agenda item is for the Board to consider an EAA staff recommendation to approve VISPO forbearance agreements (Agreements) for permitted Edwards groundwater rights for the VISPO in support of the Edwards Aquifer Habitat Conservation Plan (EAHCP).   The EAHCP includes several measures intended to minimize and mitigate the impact of the use of Edwards groundwater on federally-listed threatened and endangered species associated with the Edwards Aquifer.  A significant component of the EAHCP as a conservation and springflow protection measure is the use of VISPO as a long-term conservation measure to reduce pumping from the Edwards Aquifer during severe droughts and to help maintain a minimum springflow at Comal and San Marcos springs.  The VISPO is a voluntary program through which the EAA is attempting to enroll and maintain 41,795 acre-feet of permitted irrigation rights annually into “forbearance agreements” so that the rights will go un-pumped in years of severe drought, thereby reducing demand on the aquifer at the most critical time.  Such demand reduction will improve aquifer levels and protect springflows at Comal and San Marcos springs.

 

In 2021, the listed VISPO enrollees will begin to receive payments in two ways according to the following payment schedule.  Standby Payment: Every participant in VISPO will receive a “Standby Payment” of $54 per acre-foot of enrolled permitted irrigation rights no later than March 1st of each year.  This payment will be made regardless of whether or not the participant is required to suspend pumping the enrolled rights during that year.  Forbearance Payment:  If the water level at the J-17 index well in San Antonio is at or below 635 feet above mean sea level (msl) on October 1 of any year, the EAA will notify program participants to suspend the pumping of the enrolled water for the following year beginning on January 1.  In years in which pumping of enrolled water is suspended, participants will be paid an additional “Forbearance Payment” of $160 per acre-foot of enrolled permitted irrigation rights no later than March 1st of that year.  The enrolled irrigation groundwater rights may not be pumped for the remainder of that year, regardless of aquifer levels.

 

EAA received a VISPO Enrollment Application from the following permit holders for a 5-year contract term.

 

Permit No.:                     P101-445

Permit Holder:                     A & S Ranch, Ltd.

Effective:                     2021

Enrolled Amt.:                     242.000 acre-feet

Option Costs (min/max):                     $65,340.00 / $258,940.00

 

Permit No.:                     P101-704

Permit Holder:                     A & S Ranch, Ltd.

Effective:                     2021

Enrolled Amt.:                     225.000 acre-feet

Option Costs (min/max):                     $60,750.00 / $240,750.00

 

Permit No.:                     P101-863

Permit Holder:                     A & S Ranch, Ltd.

Effective:                     2021

Enrolled Amt.:                     131.031 acre-feet

Option Costs (min/max):                     $35,378.37 / $140,203.17

 

Permit No.:                     P101-041

Permit Holder:                     Troy L. Bippert and Michelle Bippert, Shawn P. Noonan and Kris A. Noonan

Effective:                     2021

Enrolled Amt.:                     154.000 acre-feet

Option Costs (min/max):                     $41,580.00 / $164,780.00

 

Permit No.:                     P101-391

Permit Holder:                     Ray Griggs and Sharon M. Griggs

Effective:                     2021

Enrolled Amt.:                     18.000 acre-feet

Option Costs (min/max):                     $4,860.00 / $19,260.00

 

Permit No.:                     P101-638

Permit Holder:                     William E. Schultz, Jr. and Pamela M. Schultz

Effective:                     2021

Enrolled Amt.:                     15.000 acre-feet

Option Costs (min/max):                     $4,050.00 / $16,050.00

 

Permit No.:                     P100-027

Permit Holder:                     Archbishop of San Antonio - St. Joan of Arc Catholic Church

Effective:                     2021

Enrolled Amt.:                     2.800 acre-feet

Option Costs (min/max):                     $756.00 / $2,996.00

 

EAA staff has reviewed and confirmed the accuracy of the permit information contained in the applications above.  The total amount of groundwater rights secured by the EAA in VISPO Agreements effective in 2021 is now 40,432.480 acre-feet.  Attached to this summary is the template of the five-year agreement and a resolution and order.  Both have been reviewed by legal counsel.

 

Staff recommends the board approve forbearance agreements for permitted Edwards groundwater rights between the EAA and the permit holders listed above, in the total amount of not less than $212,714.37 and not more than $842,979.17 for the VISPO in support of the Edwards EAHCP.

 

 

M/WBE PARTICIPATION:

 

This agenda item does not involve the procurement of goods or services by the EAA and, therefore, this section is not applicable.

 

 

STRATEGIC PLAN REFERENCE:

 

This agenda item supports the EAA's policy direction as set forth in the EAA 2016-20 Strategic Plan:  Goal A. Sustain Federally Protected Aquifer-Dependent Species.

 

Acquisition of 41,795 acre-feet of water for the VISPO is required of the Edwards Aquifer Authority to maintain compliance with the Incidental Take Permit issued by USFWS on March 18, 2013.  Specifically, this item is related to the obligations of Section 5.1.2 of the Edwards Aquifer Habitat Conservation Plan.

 

 

FISCAL IMPACT:

 

Annual Payments for the forbearance agreements, effective 2021 and considered here, will be disbursed by March 1, 2021, and will range in total from $42,542.87 (stand-by payment only) to $168,595.83 (forbearance + stand-by).  The 2021 proposed budget will reflect the appropriate amount for VISPO payments following the October 1, 2020 "trigger" date.

 

The amount of $42,542.87 for standby payments and $168,595.83 for suspension payments will be included in Table 7.1A of the EAHCP.

 

The amount of $4,172,000 is included annually in Table 7.1 of the EAHCP and is derived with the following assumptions:

 

The full enrollment of 40,000 acre-feet is achieved;

 

The ratio of 5-year to 10-year enrollment is 70% 5-year and 30% 10-year, consistent with the results obtained from an interest survey completed in

2010 by irrigators;

 

An annual cost for the 5-year and 10-year Standby and Implementation payments is determined by averaging the total 10-year costs; and

 

Modeled results indicated an implementation rate of 16 times in the 54-year model history (30%) and a spreadsheet was created that contained

the projected implementation history for all 54 years; where the annual cost was determined by averaging the costs for the 54-year period.

 

The total estimated cost for VISPO in Table 7.1 of the EAHCP over the fifteen-year term is $62,580,000.