Title
Consider recommendation from the Permits/Enforcement Committee to approve a conversion of base irrigation groundwater owned by DH335 Partners, LLC, based on the installation of conservation equipment.
Body
RECOMMENDED MOTION:
Move the board adopt a Final Order Granting Application to Convert Base Irrigation Groundwater for Initial Regular Permit No. P102-029 (UV00575) based on the installation of conservation equipment submitted by DH335 Partners, LLC.
SUMMARY:
The purpose of this agenda item is for the board to consider a Permits/Enforcement Committee recommendation to approve an Application to Convert Base Irrigation Groundwater to unrestricted irrigation groundwater based on the installation of conservation equipment. Generally, irrigation Initial Regular Permit (IRP) holders cannot permanently change the place of use or the purpose of use for base irrigation groundwater (BIG) withdrawal rights. However, §711.342 of the EAA Rules allows IRP holders to convert BIG withdrawal rights to unrestricted irrigation groundwater (UIG) withdrawal rights if certain conditions are met under the following two scenarios:
Water Conservation: IRP holders must submit an application that demonstrates the conservation of water after the installation of water conservation equipment, or
Change in Land Use: IRP holders must submit an application to the EAA consistent with §711.342 of the Edwards Aquifer Authority Rules, demonstrating either sufficient physical development of the land or evidence that the land is no longer practicable to farm.
The IRP holder applying to convert BIG withdrawal rights must also provide supporting documentation. In addition to the information provided by the applicant, EAA staff reviews county records and performs a site inspection to verify the BIG withdrawal rights conversion application. In the application presented for consideration, these requirements have been met. Following is a summary of the BIG conversion application based...
Click here for full text